2011   Davey Road Bridge

Client: District Council of Yankalilla

Replacement of old bridge and widening of Davey Road, Carrickalinga.

back to top


2011   Crow Road Bridge

Client: District Council of Yankalilla

Replacement of damaged bridge and lifting of 400m of road, Crow Road, Myponga

back to top




2011   Port Elliot Road Widening

Client: Department For Transport, Energy and Infrastructure

Widening of road including installation of new stormwater

back to top


2011   Nangawooka

Client: Private

Complete remodelling and renovation of historic homestead gardens including retaining walls of various styles.

back to top




2010   Welch Road Subdivision

Client: Private

Rural subdivision including sealed roads, services and provision of slip lanes on main road.

back to top




2010   Goolwa Community Waste Management System

Client: Alexandrina Council

Lagoon and Wetland construction and Plumbing. Construct and install with HDPE liner and cover a 56ML lagoon with associated plumbing and pump station. Construct 10,000m2 Wetland

back to top




2010   Surfers Day Visitor Centre

Client: Department of Environment and Heritage

Remodel old camp ground to create a sealed 47 car carpark and create pedestrian paths to beach.

back to top


2010   Surfleet Cove Visitor Centre Upgrade

Client: Dept of Environment and Heritage

Build new campground and access roads

back to top






2010   Victor Harbor Tafe Relocation Project

Client: Romaldi Constructions

All preperation of complete building site from vacant lot to completed building and carparks.

back to top




2009   Cape Donnington Rd. Upgrade Stage 1

Client: Department of Environment and Heritage

Port Lincoln.
6.5 km of road realignment, new culvert crossings and seal 6m wide.

back to top




2009   Victor Central Shopping Centre Upgrade

Client: Savills Project Services

BIGW
Remove 50,000T at rear for undercroft carparking, new stormwater system for whole centre, new carparks in side street and new carpark arrangements for whole centre including kerbing and paving

back to top




2009   Goolwa North Rising Main

Client: Alexandrina Council

3.2 km 225mm rising main from Goolwa North to Treatment Works.

back to top


2009   Surfers Beach Road Upgrade and Carpark

Client: Dept of Environment and Heritage

Rebuild and Seal

back to top


2009   Goolwa Wharf Dredging

Client: Alexandrina Council

Excavate and remove approximately 22,000 tonne of material from wharf area ready for new facilities.

back to top


2008   West Cape Road Upgrade

Client: Department of Environment and Heritage

Innes National Park.
Cut new carpark into dunes and rebuild 3.2km of road for seal.

back to top


2008   The Bluff Boat Ramp

Client: City of Victor Harbor

Encounter Bay New 4 lane boat ramp facility for Victor Harbor.
Dredge new channel using excavators through rock and mud. Construct coffer dam and install new concrete ramp and Team Poly floating pontoons, new stormwater and new 100m breakwater.

back to top




2008   Alligator Gorge Road Upgrade

Client: Department of Environment and Heritage

Mt.Remarkable conservation park.
6.5 km rebuild road and car parks and bituminise.

back to top




2007   Kambalda Water Supply Upgrade

Client: W.A. Watercorp Kalgoorlie

W.A Water Corporation
Major upgrade on WWTP and water supply sites as subcontractor for all earthmoving and trenching required 6 months duration

back to top




2007   Goolwa STEDS Upgrade

Client: Alexandrina Council

New 125mL effluent pond with HDPE liner and associated Plumbing and roads.

back to top


2006   Glenelg Waste Water Treatment Plant

Client: SA Water

Repairs to inlet chamber, Installation of new valves and pipe work Including excavation, kerbs, paving and roadworks.

back to top




2006   Adelaide Road Slip Lane

Client: Dept Transport Energy & Infrastructure

New slip lane at entrance to subdivision Victor harbor.

back to top


2006   Maude St. Wetlands

Client: City of Victor Harbor

New stormwater control wetland in Victor Harbor, 6000 cubic meters removed for landscaping and fitted bentomat liner.

back to top


2005   Southern Cross Care McCracken

Client: Southern Cross Care

New 26 home subdivision, stormwater, sewer, water, fire water, retaining walls and pavement.

back to top


2005   Port Elliot STEDS Lagoon Upgrade

Client: Alexandrina council

New 40ML holding pond with HDPE liner, associated plumbing, rehabilitation of old ponds and commissioning.

back to top




2004   Alligator Gorge Road Upgrade

Client: Dept of Environment and Heritage

Road widening, rehabilitation, new culverts and drainage.

back to top




2002   Blowhole Beach Upgrade

Client: Dept of Environment and Heritage

New carparks, roadworks, stormwater control, pedestrian paths, bollards and fencing.